Dams · Instrumentation
Gross Dam, Boulder, Colorado
DA Smith completed surface drilling, monitoring wells completions, and installed downhole instrumentation at Denver Water's Gross Reservoir Dam near Boulder, Colorado, for the dam raise.
18 projects
Specialized drilling in and around concrete and embankment dams, including concrete and bedrock coring, foundation drain drilling, in situ stress measurements, monitoring well installation, and geotechnical instrumentation.
Dams · Instrumentation
DA Smith completed surface drilling, monitoring wells completions, and installed downhole instrumentation at Denver Water's Gross Reservoir Dam near Boulder, Colorado, for the dam raise.
Dams · Instrumentation
DA Smith drilled and completed piezometer monitoring wells inside the inspection galleries at Denver Water's Gross Reservoir Dam near Boulder, Colorado.
Dams · In Situ Stress Measurements
DA Smith performed specialized core drilling, in situ stress measurements, and geotechnical instrumentation installation to support dam safety evaluation and long-term monitoring at Rock Island Dam.
Dams · Geotechnical
DA Smith completed a second helicopter-supported season at La Prele Dam near Douglas, Wyoming, for RESPEC's geotechnical study.
Dams · Geotechnical
DA Smith core drilled through concrete into bedrock inside the lowest level of Kerr Dam's powerhouse near Pryor, Oklahoma.
Dams · Geotechnical
DA Smith cored HQ holes from a helicopter-access cliff-top site below La Prele Dam for RESPEC.
Dams · Geotechnical
Phases 1 and 2 of RESPEC's multi-year geotechnical drilling program at La Prele Dam near Douglas, Wyoming, the oldest and tallest open-front dam in the US.
Dams · In Situ Stress Measurements
DA Smith has drilled at Dominion Energy's Roanoke Rapids concrete buttress dam six times since 2007 to help evaluate its structural integrity.
Dams
DA Smith cored a horizontal utility hole from the outside face of the Sutton concrete gravity dam through to a main access corridor inside the dam.
Dams
DA Smith cored six horizontal holes up to 40 feet deep into Boundary Dam's right abutment for Seattle City Light's slope stabilization.
Dams
DA Smith cored 22-inch holes yielding 18-inch concrete cores to 35 feet deep on the crest of Shasta Dam for the US Bureau of Reclamation.
Dams
DA Smith cored, sampled and logged concrete at five locks and dams on the upper Mississippi River for the US Army Corps of Engineers.
Dams · In Situ Stress Measurements
DA Smith drilled, instrumented and measured in situ stress for HDR at Duke Energy's Walters concrete arch dam in western North Carolina.
Dams · In Situ Stress Measurements
DA Smith drilled and made overcore stress measurements for HDR at the Duke Energy Keowee Dam spillway at the Oconee Nuclear Station.
Dams · Instrumentation
During construction of Ridges Basin Dam near Durango, DA Smith drilled boreholes and installed piezometers and an inclinometer in its foundation.
Dams · In Situ Stress Measurements
DA Smith drilled, instrumented and measured in situ stress for Acres International at the New York Power Authority's Niagara dam.
Dams · In Situ Stress Measurements
DA Smith supplied the equipment and crew for overcore stress measurements at the US Bureau of Reclamation's Seminoe Dam near Rawlins, Wyoming.
Dams · In Situ Stress Measurements
Overcore stress measurements from a barge and an inspection tunnel showed Santeetlah Dam's arch was not bending from expansion of its buttresses.