Tunnels
BART Caldecott Tunnel, Oakland, California
DA Smith core drilled around the clock inside the Bay Area Rapid Transit (BART) Caldecott heavy rail commuter tunnel.
3 projects
Coring and rotary drilling at any angle inside transportation and water tunnels, with geotechnical instrumentation and downhole logging.
Tunnels
DA Smith core drilled around the clock inside the Bay Area Rapid Transit (BART) Caldecott heavy rail commuter tunnel.
Tunnels
DA Smith core drilled around the clock to assess stability inside a 9-mile section of a major northern California water supply tunnel.
Tunnels
DA Smith core drilled to support rehabilitation of Cross Passage 5 in CDOT's Hanging Lake Tunnel on I-70 near Glenwood Springs.